Pacific Roofing Systems worked on the Van Nuys High School project for 16 months due to the scheduling challenges of working around the school year and children on campus. The project involved a custom Curved Tee-Panel Metal Roofing System with panel lengths spanning over 88 feet long. These panels were roll formed on the second story of the school to ensure the correct radius for the project and primarily because panels of this length are virtually impossible to transport.

The scope of the work included:

  • Custom Installation of Metal Roofing
  • Soffit Metal Panel
  • Gutters & downspouts
  • Scuppers
  • General Sheet Metal Flashings
  • Wall Panels